Abstract

The ITER project is under construction in Cadarache, France, to assemble and operate an experimental nuclear fusion facility. The aim of this paper is the description of the implementation of the French Order of February 7, 2012, concerning Basic Nuclear Installation (also called “INB” Order) [1] within the European Union Domestic Agency (EU-DA), specifically on the Electron Cyclotron Upper Launcher (EC UL). The EC UL will be used for the control and heating of the ITER plasma. The launcher includes the port plug and related in-vessel items (nuclear shielding, blanket module, and optics) and the ex-vessel first confinement items (diamond window, isolation valve, waveguides, miterbends, tapers and port plug back end).

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.