Abstract

In order to solve the traditional problems, this paper designs a new decision system of power supply line selection for new energy distribution network enterprises based on digital twins. The hardware of the system is composed of scheduler, processor and data collector. GYSI-937 scheduler is used to set up two channels to receive signals. At the same time, two channels send instructions, 8 memory slots are built in the edge of the processor, and the memory is upgraded when needed. JSUI-93 data-collector adopts four-core 2.0 GHZ to improve the running speed. In the part of system software, the system design is realized by analyzing the attribute information, constructing the power network chart, creating the dispatching scheme and integrating the hardware and software. The experimental results show that the dynamic response speed of power supply line selection decision system based on digital twinning is faster and the utilization ratio is higher.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.