Abstract

We study PO and POCL plans with regard to their makespan – the execution time when allowing the parallel execution of causally independent actions. Partially ordered (PO) plans are often assumed to be equivalent to partial order causal link (POCL) plans, where the causal relationships between actions are explicitly represented via causal links. As a first contribution, we study the similarities and differences of PO and POCL plans, thereby clarifying a common misconception about their relationship: There are PO plans for which there does not exist a POCL plan with the same orderings. We prove that we can still always find a POCL plan with the same makespan in polynomial time. As another main result we prove that turning a PO or POCL plan into one with minimal makespan by only removing ordering constraints (called deordering) is NP-complete. We provide a series of further results on special cases and implications, such as reordering, where orderings can be changed arbitrarily.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.