Abstract

Considerable energy is consumed during steel manufacturing process. Byproduct gas emerges as secondary energy in the process; however, it is also an atmospheric pollution source if it is reteased into the air. Therefore, the optimal utilization of byproduct gas not only saves energy but also protects environment. To solve this issue, a forecast model of gas supply, gas demand and surplus gas in a steel plant was proposed. With the progress of energy conservation, the amount of surplus gas was very large. In a steel plant, the surplus gas was usually sent to boilers to generate steam. However, each boiler had an individual efficiency. So the optimization of the utilization of surplus gas in boilers was a key topic A dynamic programming method was used to develop an optimal utilization strategy for surplus gas. Finally, a case study providing a sound confirmation was given.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.