Abstract

This article proposes guidelines for managers and researchers regarding appropriate planning intervals in labor scheduling. This study distinguishes between planning intervals used for data collection and intervals used for scheduling employees. This distinction is relevant because it is not necessary for the two interval types to be of the same duration. The results of a simulation experiment show that both increased variability in the customer-arrival rate and high mean customer-arrival rates work to reduce the ideal length of both data-collection and schedule-development intervals. In fact, with a mean arrival rate of five customers per minute, the most profitable labor schedules originated with a five-minute data-collection interval combined with a five-minute schedule-development interval. At present, because of the paucity of procedures that can accommodate such brief intervals, managers will find fifteen-minute data-collection and schedule development intervals generally to be the most effective.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.