Abstract

Claims by contractors for additional payments have been identified by commentators as a major source of difficulty in the industry. Ethnographic research with industry members reveals some key features of planning practices that underlie such events. Claims are sometimes planned at tender stage and sometimes during the course of a project. One practice at tender stage is a pricing technique that minimizes the tender price while maximizing the out‐turn cost of a contract by exploiting mistakes in the bill of quantities. Another is the programming of work to maximize its vulnerability to delay. More reactive techniques may be employed during the course of the project, often to make up for an unanticipated increase in costs. These and other similar practices may be reported as features of an integrated culture, defined in such a way as to encompass activity and reject Cartesian dualism. The unique adequacy requirements of methods are suitable criteria for the evaluation of such reports. The claims culture arises from economic conditions in the industry, which include low entry barriers and competitive tendering. However, removal of these conditions alone cannot guarantee that the practices will cease.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.