Abstract

AbstractSuccessful deployment of electric vehicles demands for establishment of simple reachable charging stations (CSs). Scheduling and action of CSs is a composite problem and that should not affect the smooth operation of the power grid. The present paper attempts to solve the planning and operation of CSs by a novel chicken swarm optimization‐based heuristics. The placement of CS is modelled in a multi‐objective framework as cost‐effective parameters secures the operation of the power grid. Further, the operation of CSs is examined for three scenarios such as uncoordinated charging, coordinated charging, as well as bidirectional vehicle to grid. The proposed approach is tested on IEEE 33‐bus, and on a distribution network of Guwahati, India.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.