Abstract

This study aims to characterize the performance of a 150L bioelectrochemical system-based plant, during the simultaneous carbon and nitrogen removal from several waste streams of wastewater treatment plants. The bioelectrochemical system (BES) contained five electrode pairs (operated hydraulically and electrically in parallel) and was fed with either wastewater, centrate (nutrient-rich liquid stream produced during the dewatering of digested biomass), or a mixture of both over 63 days, with a hydraulic retention time of one day. Total organic carbon and total nitrogen removal rates averaged 80% and 70%, respectively, with a specific energy consumption of 0.18kWh·m-3 (BES+ancillary equipment). This work also underlines the challenges of using BES for nitrogen removal, highlighting the limitations of the current design, and suggesting some strategies for improvement.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.