Abstract

There is no practical external source of tritium for fusion energy development beyond ITER and all subsequent fusion systems have to breed their own tritium. To ensure tritium self-sufficiency, the calculated achievable tritium breeding ratio (TBR) should be equal to or greater than the required TBR. The potential of achieving tritium self-sufficiency depends on many system physics and technology parameters. Interactive physics and technology R&D programs should be implemented to determine the potential of realizing those physics and technology options and parameters that have large effects on attaining a realistic “window” for tritium self-sufficiency. The ranges of plasma and technology conditions that need to be met, in order to ensure tritium self-sufficiency, are identified.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.