Abstract

This research aims to minimize the cost of the PV system according to minimization of the PV array area and storage battery. In this paper, a new method is used to calculate the minimum number of storage days and the minimum PV array area. The pre-operating time of the diesel-generator is also incorporated in our system design. A system sizing program using FORTRAN language is developed. The program is used to size our experimental system which consists of a PV system, storage subsystem and diesel-generator. The proposed sizing program can be used to size any system. A comparison between stand-alone and hybrid system sizing is presented in this paper.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.