Abstract
AbstractTo measure the statistical performance of a control chart in Phase I applications, the in‐control average run length (ARL) is the most frequently used parameter. In typical start up situations, control limits must be computed without knowledge of the underlying distribution of the quality characteristic. Assumptions of an underlying normal distribution can increase the probability of false alarms when the underlying distribution is non‐normal, which can lead to unnecessary process adjustments. In this paper, a control chart based on a kernel estimator of the quantile function is proposed. Monte Carlo simulation was used to evaluate the in‐control ARL performance of this chart relative to that of the Shewhart individuals control chart. The results indicate that the proposed chart is more robust to deviations in the assumed underlying distribution (with respect to the in‐control ARL) and results in an alternative method of designing control charts for individual units. Copyright © 2011 John Wiley & Sons, Ltd.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.