Abstract

In a multi-cluster tool, there may be both single and dual-arm cluster tools. Such a multi-cluster tool is called hybrid multi-cluster tool. To operate such a multi-cluster tool, one needs to coordinate different types of robots for accessing the shared buffering modules. Aiming at finding a one-wafer periodic schedule such that the lower bound of cycle time can be reached, this paper conducts a study on scheduling a hybrid multi-cluster tool with its bottleneck tool being process-bound. The tool is modeled by a kind of timed Petri net model. With this model, the scheduling problem is reduced to determining the robots' waiting time. Then, the conditions under which a one-wafer periodic schedule exists such that the lower bound of cycle time can be reached are presented. Based on them, a closed-form algorithm is given to check whether such a one-wafer periodic schedule exists. If so, it is found via simple calculation. Examples are given to show the application of the proposed method.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.