Abstract

This paper focuses on the flow shop sequence dependent group scheduling (FSDGS) problem with minimisation of total completion time as the criterion (Fm|fmls, prmu, Splk|∑Cj). The research problem is formulated in form of two different mixed integer linear programming (MILP) models. Comparing with the latest MILP model for the proposed problem in the literature, the complexity size of the proposed models are significantly reduced. One of the proposed mathematical models is so effective that even medium-sized instances (problems up to 60 jobs in all groups) are solved to optimality in a reasonable amount of time. Moreover, a metaheuristic hybridising genetic and simulated annealing algorithm, called GSA, is proposed to solve the problems heuristically. All the results and analyses show the high performance of the proposed mathematical models as well as the proposed metaheuristic algorithm compared to the available ones in literature. (Received 11 February 2010; Revised 24 May 2010; Accepted 30 September 2010)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.