Abstract

The integration methodology of periodical replanning and hierarchical repairing is proposed to handle the prediction errors of energy demands in the multiperiod operational planning. The periodical replanning is implemented by the decomposition method. The hierarchical repairing is triggered during the execution interval when prediction errors in energy demands exist. The hierarchical repairing uses the heuristic knowledge. The efficiency indices for utility pumps are introduced to determine the optimal configuration of motors and turbines for running utility pumps without integer programming. Case studies show that the proposed method is more profitable than the periodical replanning. The operational cost is reduced by 0.9–4.0% compared with the cost by the periodical replanning.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.