Abstract
Virtual power plants (VPPs) are considered the next generation of power plants where they aggregate the distributed energy resources (DERs) aiming to participate in different electricity markets. Many of the aggregated DERs within the VPP have ambiguous future performance. Thus, to maximize profit in the electricity market, VPP needs offering curve construction approaches that could deal with different sources of uncertainty. In this study, we investigate the VPP participation problem in the day-ahead electricity market. We propose strategies that can be utilized by a VPP to deal with uncertainty from both risk-averse and profit-seeking viewpoints. Thorough numerical studies and out-of-sample analysis demonstrate the given approaches’ features and their superiority over the existing methods in the literature.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.