Abstract
The scheduler in the Cyber-176 computer does the major functions of routing the job through the system, controlling job's progress through aging and swapping of jobs between various queues and resource allocation among jobs. This paper reports some results of the performance evaluation study of the Cyber-176 by modeling the scheduler as the heart of the system. The study explores the effects of varying the scheduler parameters in the performance of the machine in a particular installation. The basic theme of the paper is that the selection of parameters in a laboratory or a system test environment may not always result in the best performance in an actual installation. The simulation provides vital information for installation management and tuning the operating system.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.