Abstract
For performance analysis of flood prevention projects, this study performed simulation (SWMM) for the five sites where the projects have been completed. The models were constructed using watershed and sewer information of the project sites and were verified using flood records in the past to improve accuracy. In this simulation, the design rainfall data (probability 30~50 years) and the rainfall data in the summer of 2017 were applied. When the design rainfall data was applied to the models, simulation results presented that all the sites were flooded before the projects, but after the projects all the sites were not flooded due to improve discharge capacity. And when the rainfall data in the summer of 2017 was applied to the models, simulation results presented that all the sites were flooded before the projects, but after the projects any sites did not occur flooding in this summer. So if the projects had not been completed, all the sites might be flooded in the summer of 2017. These effects were analyzed as the improvement of discharge capacity due to rehabilitation of sewer, construction of underground tunnel and pumping station, etc. As the results, ratio of sewer that water depth exceed diameter reduced from 52.3~75.8% to 17.1~39.8%.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: Journal of the Korean Society of Water and Wastewater
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.