Abstract

This article presents an approximation method for fluid flow production lines with multi-server workstations and finite buffers. Each workstation consists of parallel identical servers, which are subject to operation-dependent failures with exponentially distributed uptimes and downtimes. The proposed method decomposes the production line into single-buffer subsystems, each described by a continuous state Markov process, the parameters of which are determined iteratively. The approximation method is appropriate for the analysis of longer production lines, able to accurately estimate performance characteristics (e.g., throughput and mean buffer content), and shown to perform well on a large test set.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.