Abstract
As China has been quickly promoting its power market reform, the degree of thermal power units participating in market transaction has been gradually deepened. Aiming at different situations of load, thermal power units need to adopt bidding strategy accordingly. In power system with high proportion of renewable energy, the competition curve that thermal power units actually face is no longer total load curve. Proper division of peak-valley time intervals will guide thermal power units to adjust bidding strategy positively and effectively in the competition. A net-load-curve-based peak-valley time division model is built in this paper with the help of K-means algorithm. And then the paper contrasts and analyses the distributive characteristics of total and net load curves through a calculation example to verify the positive effect this model has on accurate bid for thermal power units.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: IOP Conference Series: Earth and Environmental Science
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.