Abstract
Manufacturing in process industries mostly takes place in multi-level supply networks consisting of several plants which are located at different sites and linked by complex logistics relations and material flows. Thus, a key issue is the coordination of plant operations considering the supply of intermediates between various plants. Time-consuming setup and cleaning activities require production to be carried out in campaigns. We propose an application-oriented approach for supply network planning in the pharmaceutical industry which is based on a novel aggregation scheme and a disjunctive graph representation of the problem. A mixed-integer linear programming model is proposed based on a continuous representation of time. Our approach generates a comprehensive schedule which coordinates the production activities, including the campaigns in the network. Numerical results show that our approach yields solutions for small- and medium-sized problem instances very quickly and is even capable of coping with the complexity of real world problems.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.