Abstract

Our institutional quality-improvement (QI) initiative instituted a well-defined office follow-up schedule after arteriovenous fistula (AVF) creation, including an office visit within 30 days, fistulogram within 40 days, if indicated, and a second office visit within 55 days. In addition, a patient liaison contacted patients and dialysis units to improve follow-up. The purpose of this study was to determine the effect of the QI initiative on patient compliance and overall time to AVF permission to cannulate. We performed a retrospective review of patients undergoing first-time radiocephalic, brachiocephalic, and basilic vein transposition creation before the QI initiative (pre-QI group: January to April 2012) and during the QI period (QI group: January to April 2013). Categoric data were compared using χ(2) analysis, and nominal data were compared using the Student t-test. We reviewed 198 first-time AVF creations in patients (57% male) with a mean age of 61 years. Demographics and comorbidities between the pre-QI and QI groups were similar. Compliance with the first 30-day postoperative appointment increased significantly after the QI initiative, from 48% in the pre-QI group to 65% in the QI group (P = .015). Yet, the QI initiative did not maintain an effect on the subsequent follow-up checkpoints. No statistical difference was identified for compliance with fistulogram within 40 days of access creation (pre-QI, 12% vs QI, 25%; P = .093) or for compliance with the 55-day postoperative appointment (pre-QI, 33% vs QI, 23%; P = .457). Both checkpoints demonstrated a very high noncompliance rate. Accordingly, the mean time to permission to cannulate was 88 days for both the pre-QI and QI groups, with a failure to mature rate of 22% for the pre-QI group and 21% for the QI group (P = .816). The QI initiative significantly increased the number of patients complying with the first 30-day follow-up appointment after AVF access creation. However, patient compliance with a timely fistulogram and the second follow-up appointment was poor and not influenced by the QI initiative, limiting the functional effect of the QI initiative on the time to AVF permission to cannulate.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.