Abstract

We consider online preemptive scheduling of jobs arriving one by one, to be assigned to two identical machines, with the goal of makespan minimization. We study the effect of selecting the best solution out of two independent solutions constructed in parallel in an online fashion. Two cases are analyzed, where one case is purely online, and in the other one jobs are presented sorted by non-increasing sizes. We show that using two solutions rather than one improves the performance significantly, but that an optimal solution cannot be obtained for any constant number of solutions constructed in parallel. Our algorithms have the best possible competitive ratios out of algorithms for each one of the classes.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.