Abstract

Parallel batch scheduling has many applications in the industrial sector, like in material and chemical treatments, mold manufacturing and so on. The number of jobs that can be processed on a machine mostly depends on the shape and size of the jobs and of the machine. This work investigates the problem of batching jobs with multiple sizes and multiple incompatible families. A flow formulation of the problem is exploited to solve it through two column generation-based heuristics. First, the column generation finds the optimal solution of the continuous relaxation, then two heuristics are proposed to move from the continuous to the integer solution of the problem: one is based on the price-and-branch heuristic, the other on a variable rounding procedure. Experiments with several combinations of parameters are provided to show the impact of the number of sizes and families on computation times and quality of solutions.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.