Abstract

In this study, we propose a model that extends the assembly line balancing problem (ALBP) to consider parallel lines with tool requirements by task and demand fulfillment (ALBPTD). We develop an integer program to minimize the system's total cost including the variable operational and fixed costs associated with workstations and tooling. The proposed model investigates the best demand distribution among lines. To assess the model's performance, test data sets from the literature are employed with different problem sizes and precedence structures. The model performs well in terms of computational time for medium sized problems.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.