The U.S. Nuclear Regulatory Commission (NRC) established a new process for licensing nuclear power plants under Title 10 of the Code of Federal Regulations (10 CFR) Part 52, “Licenses, Certifications, and Approvals for Nuclear Power Plants,” which provides requirements for early site permits (ESPs), standard design certifications (DCs), and combined license (COL) applications. In this process, an application for a COL may incorporate by reference a DC, an ESP, both, or neither. This approach allows for early resolution of safety and environmental issues. The COL review will not reconsider the safety issues resolved by the DC and ESP processes. However, a COL application that incorporates a DC by reference needs to demonstrate that pertinent site-specific parameters are confined within the safety envelopes established by the DC. This paper provides an overview of site parameters related to seismic designs and associated seismic issues encountered in DC and COL application reviews using the 10 CFR Part 52 process. Since DCs treat the seismic design and analysis of nuclear power plant (NPP) structures, systems, and components (SSC) as bounding to future potential sites, the design ground motions and associated site parameters are often conservatively specified, representing envelopes of site-specific seismic hazards and parameters. For a COL applicant to incorporate a DC by reference, it needs to demonstrate that the site-specific hazard in terms of ground motion response spectra (GMRS) is enveloped by the certified design response spectra of the DC. It also needs to demonstrate that the site-specific seismic parameters, such as foundation-bearing capacities, soil profiles, and the like, are confined within the site parameter envelopes established by the DC. For the noncertified portion of the plant SSCs, the COL applicant should perform the seismic design and analysis with respect to the site-specific GMRS and associated site parameters. This paper discusses the seismic issues encountered in the safety reviews of DC and COL applications. Practical issues dealing with comparing site-specific features to the standard designs and lessons learned are also discussed.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.