Abstract

ABSTRACTSince 1992 Maurer Söhne is developing an automated car park system and now has built a prototype for the City of Augsburg, 60 km west from Munich. During this project problems arose, especially with respect to changes. Therefore, Maurer Söhne started to implement systems engineering methods to overcome those problems in the planned serial production of the automated car park system. This paper is not a glorification of a development process, instead it describes the problems and their causes, what we called “management by Beckenbauer”, during the development phase. Furthermore, the paper shows how Maurer Söhne started to solve one of the main problems, i.e. to manage changes, by implementing special systems engineering methods.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.