Abstract

The success of public–private partnership (PPP)–build–operate–transfer (BOT) projects largely depends on effectively mitigating the impact of a variety of risks and uncertainties, especially those influencing the revenue over time. Revenue instability is one of the main obstacles of PPP form of procurement. Government support, which is established as a clause in the concession agreement, should be carefully designed and well formulated. Options which arise from certain clauses in the contract are more valuable for risky projects. The purpose of this paper’s proposed model is to evaluate early fund generation options and also to calculate equitable bounds for a guaranteed revenue for the project sponsor under uncertainty and risk. The model is specially designed to alleviate the concern of revenue risk. To illustrate its applicability the methodology is then applied to a freeway PPP project and a power plant PPP project in Iran. The results show that the value of these options can indeed be significant and by applying the proposed systematic negotiation mechanism both public and private sectors can take advantage of its flexibility at the negotiation table. The proposed mechanisms can facilitate negotiations on the verge of a break down as well as accelerating ongoing negotiations that have become moribund.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.