Abstract
Matters concerning selecting the optimal sequence of procedures for starting a PGU-450 combined-cycle power unit are considered. A theoretical substantiation is given of the economic advisability of optimizing the startup of this power installation according to the criterion of reducing the time taken for carrying out startup operations subject to constraints on the reliability of equipment operation.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.