Abstract
As the numbers and running distance of Chinese high-speed trains increase, many electric multiple units (EMU) gradually enter into overhaul stage, EMU maintenance bases face challenges of transition from practical exploration, regular production to lean production. In accordance of business requirement, built a model of dynamic resource allocation, task splitting, and soft precedence constraints. By the design of nonlinear decline inertia weight factor, a refined particle swarm optimization (PSO), as well as the corresponding parallel transformation scheme from particle to schedule, is presented. Finally, computational analysis is performed to validate the model and algorithm on optimization capabilities, resource utilization and performance.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.