Abstract

This paper addresses the problem of preventive maintenance (PM) strategy optimization in a semiconductor manufacturing environment, with the objective of minimizing maintenance costs. The approach developed takes into account the interaction of production and maintenance aspects. For this purpose, a discrete-event production-oriented simulator (MELISSA-C++) has been extended to incorporate equipment failures and maintenance operations, thus modeling residual breakdowns, occurring in a combined corrective/PM context. The usefulness of the simulation tool has also been demonstrated for the estimation of both direct and indirect maintenance costs, which are impossible to determine empirically due to the reentrant nature of product flows in a semiconductor manufacturing facility. The results obtained have confirmed the marked effect of equipment characteristics (bottleneck or non-limiting step) on maintenance cost evaluation. Following a tutorial example, typical results are presented and analyzed.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.