Abstract

The purpose of this paper is to analyse the impact of ground potential rise in the design of substation. Investigation of soil structure in the substation site is the pre-requirement to design the substation. Number of layers, resistivity of each layer and thickness are the parameters to be estimated with the measured site data. By using RESAP module of CDEGS software optimizing the parameters of soil structure. Ground potential rise of substation to be computed when the fault current is injected in to the grounding grid in power frequency using MALZ module and HIFREQ module of CDEGS. Further discussed about the safest ground potential rise and the ways to improve the safest GPR.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.