Abstract

Reservoir operations play an important role in water resources planning and management. During periods of drought, when inflows to the reservoir are low, it may not be possible to satisfy the target delivery (planned demand), and shortage occurs. Reservoir hedging rules, which include a set of rule curves and rationing factors, are used to guide the operation under such a situation. In particular, hedging rules are employed to balance the current shortage in supply with future storage to avoid severe water shortages in the future. In general, hedging rules are determined at the planning stage, or at the early stage of a reservoir’s operating life. However, after years of operation, the reservoir system, as well as the demand characteristics, may change. Hence, it becomes necessary to reevaluate and update the existing hedging rules to incorporate changes that have taken place. The purpose of this paper is to devise new hedging rules for an existing multireservoir system. An original mixed-integer nonlinea...

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.