Abstract

The article proposes to balance processes with non-rhythmic flow-lines according to the period of work execution with the use of complex mechanized machines (CMM). An increase in the period of deployment in the flow-line and downtime of non-critical works calculated by the Critical Path Method requires the development of optimization methods to reduce the construction period. We proposed a hypothesis to equalize work rhythms due to the redistribution of work volumes on interdependent divisions (ID) between CMMs. A typical matrix model is used to compare the period of work execution. The calculation formulas are given for determining the execution time on the ID, the deployment period of the flow-line, the brigade, and the building. There is a new method of optimizing the flow-line deployment period with the parallel use of complex mechanized machines proposed in the article. This method shortens the construction period.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.