Abstract
The large structure parameter of a sublevel caving method was used in Beiminghe iron mine. The ores were generally lower than the medium hardness and easy to be drilled and blasted. However, the questions of boulder yield, “pushing-wall” accident rate, and brow damage rate were not effectively controlled in practical blasting. The model test of a similar material shows that the charge concentration of bottom blastholes in the sector is too high; the pushing wall is the fundamental reason for the poor blasting effect. One of the main methods to adjust the explosive distribution is to increase the length of charged blastholes. Therefore, the field tests with respect to increasing the length of uncharged blastholes were made in 12# stope of −95 subsection and 6# stope of Beiminghe iron mine. This paper took the test result of 12# stope as an example to analyze the impact of charge structure on blasting effect and design an appropriate blasting parameter that is to similar to No.12 stope.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: International Journal of Minerals, Metallurgy, and Materials
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.