Abstract
An optimisation platform based on genetic algorithm (GA) is presented, where the main components of a wind farm and key technical specifications are used as input parameters and the electrical system design of the wind farm is optimised in terms of both production cost and system reliability. The power losses, wind power production, initial investment and maintenance costs are considered in the production cost. The availability of components and network redundancy are included in the reliability evaluation. The method of coding an electrical system to a binary string, which is processed by GA, is developed. Different GA techniques are investigated based on a real example offshore wind farm. This optimisation platform has been demonstrated as a powerful tool for offshore wind farm design and evaluation.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.