Abstract

We investigate the allocation of resources in a two-sector economic model with a Cobb–Douglas production function for different depreciation rates with an integral functional on a finite time horizon. The problem is reduced to some canonical form by the scaling of phase variables and time. The extremal solution constructed by Pontryagin’s maximum principle is shown to be optimal. For a sufficiently large planning horizon, the optimal control has two or three switch points, contains one singular section, and vanishes on the final section. A transition “calibration” regime is observed between the singular section, where the system moves along a singular ray, and the final section. The maximum-principle boundary-value problem is solved in explicit form and the solution is illustrated with graphs based on numerical calculations.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.