Abstract
This paper proposes an optimization method for the optimal placement of phasor measurement units (PMUs) for the complete observability of power systems. The proposed method is based on numerical observability and articial intelligence. The articial intelligence algorithm used is the improved tabu search (ITS) algorithm. The ITS is used to nd the optimal placement for the PMU to keep the system completely observable. In addition, the paper describes a predictive out-of-step (OOS) algorithm based on the observation of the voltage phase dierence between the substations. The proposed optimal placement of the PMUs and the OOS algorithm is tested using the IEEE 6-bus and IEEE 14-bus systems, and the Egyptian 500 kV network. The test systems are simulated using the power system computer aided design software program. The placement algorithm and the OOS prediction algorithm are carried out using MATLAB script programs.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: TURKISH JOURNAL OF ELECTRICAL ENGINEERING & COMPUTER SCIENCES
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.