Abstract

In this paper, a challenging power system problem of effectively scheduling generating units for maintenance is presented and solved. The problem of generator maintenance scheduling (GMS) is solved in order to generate optimal preventive maintenance schedules of generators that guarantee improved economic benefits and reliable operation of a power system, subject to satisfying system load demand, allowable maintenance window, and crew and resource constraints. A multiple swarm concept is introduced for the modified discrete particle swarm optimization (MDPSO) algorithm to form a robust algorithm for solving the GMS problem. This algorithm is referred to by the authors as multiple swarms-modified particle swarm optimization (MS-MDPSO). The performance and effectiveness of the MS-MDPSO algorithm in solving the GMS problem is illustrated and compared with the MDPSO algorithm on two power systems, the 21-unit test system and 49-unit Nigerian hydrothermal power system. The GMS of the two power systems are considered and the results presented shows great potential for utility application in their area control centers for effective energy management, short and long term generation scheduling, system planning and operation.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.