Abstract

Using the Bakken shale play as a case study, the previous part of this two-part series demonstrated how small-scale mobile plants could be used to monetize associated or stranded gas effectively. Here, we address the issue of uncertainty in future supply, demand and price conditions. To this end, we modified our multi-period optimization framework to a stochastic programming framework to account for various scenarios with different parameter realizations in the future. The maximum ENPV (expected net present value) obtained was $2.01 billion, higher than the NPV obtained in the previous part. In addition, the value of the stochastic solution was 0.11% of the optimal ENPV, indicating that the flexible nature of mobile plants affords them a great advantage when dealing with uncertainty.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.