Abstract

In this paper, an optimal capacity model of battery energy storage system (BESS) for wind farm integration with adapting the scheduling plan is proposed. By analyzing the characteristics of wind output, the equivalent cycle life of BESS considering the effects of irregular charge and discharge on cycle life is introduced to the optimal model. From the point of view of the maximum net benefits of the wind storage union system, an optimal capacity model of BESS with considering investment costs, operating benefit, and wind curtailment saving is proposed based on the unit commitment. Thus, a more reasonable model is achieved with considering the influence of BESS providing reserve capacity on wind output uncertainty and the adaptability of BESS charge/discharge process to the scheduling plan. Finally, results based on the above analysis are listed to show the effect of equivalent cycle life and the reserve degree on the optimal BESS capacity. A foundation is laid for allocating BEES capacity of wind farm in matching with the dispatching operation.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.