Abstract

This paper presents the optimal batch scheduling of a multi-product dairy process using an approach that combines optimization and constraint programming techniques. A suitable model describing the subprocesses and production rules is developed allowing to obtain scheduling constraints relating the production process and the machines available together with their relative efficiencies. After the scheduling problem has been formulated, the batch scheduling of a real powder milk/yogurt process is obtained in an optimal manner using the proposed approach with the objective of meeting customers’ deadlines considering the efficiencies/costs of available alternative machines. Results using real consumer orders on some representative scenarios corresponding to the dairy production plant used as a case study are provided. This application shows a formulation closer to the engineering problem description thanks to the constraint-based language that facilitates the adaptation of the optimization objectives and constraints to real applications.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.