Abstract

1. The monitoring and measuring instruments installed in the structures of the hydrodevelopment in the main provide monitoring of their condition. At the same time it should be noted that measurements of the drainage discharges due to unpreparedness of the measuring devices, absence of approaches, etc., are not being carried out in the full amount. 2. The results of observations of seepage during seven years of temporary operation as a whole indicate correspondence of the main indices to the design assumptions. 3. The detected anomalies of the seepage regime do not impede normal operation of the structures.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.