Abstract

n jobs are to be preemptively scheduled for processing on n machines. The machines may have differing speeds and the jobs have processing requirements which are distributed as independent exponential random variables with different means. Holding cost g(U) is incurred per unit time that the set of uncompleted jobs is U and it is desired to minimize the total expected holding cost which is incurred until all jobs are complete. We show that if g satisfies certain simple conditions then the optimal policy is one which takes the jobs in the order 1, 2, ···, n and assigns each uncompleted job in turn to the fastest available machine. In the special case in which the objective is to minimize the expected weighted flowtime, where there is a holding cost of wi while job i is incomplete, the sufficient condition is simply w1 ≧ … ≧ wn and λ1 w1 ≧ … ≧ λn wn.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.