Abstract

Many heuristics based on the directed acyclic graph (DAG) have been proposed for the static scheduling problem. Most of these algorithms apply a simple model of the target system that assumes fully connected processors, a dedicated communication sub-system and no contention for the communication resources. Only a few algorithms consider the network topology and the contention for the communication resources. This article evaluates the accuracy of task scheduling algorithms and thus the appropriateness of the applied models. An evaluation methodology is proposed and applied to a representative set of scheduling algorithms. The obtained results show a significant inaccuracy of the produced schedules. Analyzing these results is important for the development of more appropriate models and more accurate scheduling algorithms.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.