Abstract

Accelerating construction projects is a commonly used method for meeting the project deadlines and/or compensating for current delays. There are several approaches to speed-up a project, such as activity crashing and overlapping. Activity crashing means reducing activity durations through adding more resources. Activity overlapping means executing certain activities in parallel when they were supposed to be sequential in the original plan. Construction management literature is mostly focused on studying each acceleration mode separately, while the focal point of this paper is to develop a joint model and a first algorithmic implementation that involves both acceleration methods. Particularly, on reviewing the project management and scheduling literature, a mathematical model combining activity crashing and overlapping is reformulated. Also, a Genetic Algorithm is implemented on a fictitious case study. Preliminary findings of the model and algorithmic implementations identify that activity crashing alone and a mixed approach are preferred when significant compression is required, whereas activity overlapping is recommended for minimizing compression costs when only a small compression is required.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.