Abstract

The paper deals with di culties that are encountered by investors and decision-making authorities in the course of investment processes involving construction of wind power plants. Moreover, attention is focused on absence of standardized procedures that could be used to determine environmental impact of wind turbines, mainly in the scope of acoustic e ects appearing in conditions typical for operation of such devices (strong wind), high elevation of related noise sources, and the nature of the sound emission (tonality and amplitude modulation). Lack of such procedures is a source of serious ambiguities developing in assessment of all investment stages planning and forecasting, construction, and operation. An additional problem arises in the case of power plants located in the vicinity of Natura 2000 area, where construction projects are often obstructed on the grounds of unclear criteria concerning, among other things, the e ect of acoustic phenomena on birds, bats, and other animals. It follows from the research presented in this paper that the consistent system of procedures and criteria should be worked out on the grounds of long-term monitoring studies.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.