Abstract

Some method of constructing a u-stable bridge is described. A class of games with an integral constraint is indicated, in application to which this method permits the construction of the u-stable bridge in an explicit form. Following the scheme presented in [1–3], the first player's strategy extremal to the u-stable bridge can be constructed, ensuring that the game's position hits the terminal set.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.