Abstract

The influence of the J × B force on the topographical modification of W targets during a type-I-like ELM in ITER has been studied numerically. A two-dimensional (2D) fluid dynamics model is employed by solving liquid hydrodynamic Navier-Stokes equation with the 2D heat conduction equation in addition to driving forces for surface topography, such as surface tension and pressure gradient, the J × B force is particularly addressed. The governing equations are solved with the finite volume method by adequate prediction of the moving solid-liquid interface. Numerical simulations are carried out for a range of type-I ELM characteristic parameters. Our results indicate that both the surface tension and the J × B force contributes to the melt motion of tungsten plates when the energy flux is under , the surface tension is a major driving force while the pressure gradient is negligible. Our results also indicate that the J × B force makes the small hills grow at different rates at both the crater edges under a type-I-like ELM heat load with a Gaussian power density profile.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.