Abstract

A finite element model (FEM) of the offshore platform with biofouling is developed here to predict the effectiveness of the ICCP under seawater. Remotely operated vehicle (ROV) test verified that the offshore platform was fully covered by a coating‐like biofouling to protect the structures from corrosion. FE‐SEM and EDS tests demonstrated that the biofouling deposits on the offshore platform mainly contained magnesium oxides, biofouling deposits, and corrosion products doped with calcium oxides. The polarization relationships of platform steel with biofouling coverage were used as boundary conditions for the numerical simulation. Furthermore, the factors including output current, anode location, seawater conductivity, and biofouling coverage rate, which influenced the protective effectiveness, were comparatively evaluated by FEM. Then, a re‐design two‐anode ICCP system was employed to keep offshore platform in protective condition. A ROV monitored the potential distributions of the legs and demonstrated that numerical simulation results of ICCP had a good agreement with measured data.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.