Abstract

Based on the background of a highway, for tunnels with small spacing of complex stress condition, adopt various construction schemes for numerical simulation using Midas Gts finite element software under the condition of deep-buried small net distance tunnel. Use full-face excavation method, benching tunneling construction method and both side heading method to compare surrounding rock stress, surrounding rock deformation, internal force of bolt and shotcrete support system structure, lateral-wall displacement and stability of surrounding rock. Analyse displacement and stress change laws before and after the excavation of tunnel surrounding rock and supporting structure under different schemes.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.